Bob Dear, Trevor Fagg and the team have recently been risking life and limb to take out the blocks from the notches in Six Gates Weir as part of the flow works.
The aim is to try and ensure that we are making the best possible use of the current level of flows and to do everything we can to maintain maximum velocities throughout the river.
The experimentation work is being conducted in association with the EA and will also help with future river improvement plans.